Industrial Facility Equipment

OUR PROJECTS

MECHANICAL, ELECTRICAL, & PLUMBING

S3A-03-1.jpg

Chemeketa Community College Building #40/41

New Construction: MEP and Fire Sprinkler Performance design services for 10,000 square foot, 2-story administrative building.

Renovation: MEP design services for remodeling 5,600 square foot facilities shop.

CVA-09-1.jpg

Albany Historic Carousel & Museum

New Construction in Progress: MEP and Fire Sprinkler Performance design services for 19,500 square foot, historic carousel amusement.

ACA-13-1.JPG

Philomath Elementary School Renovations

Renovation: MEP and Fire Sprinkler Performance design services for 42,000 square foot elementary school.

ACA-12-2.jpg

Philomath Middle 
School Renovations

Renovation: Controls, Electrical, Plumbing and Fire Sprinkler Performance design services for 63,000 square foot middle school.

HEP-18-07.png

Sand Point Idaho Library Remodel & Expansion

Renovation and New Construction: Mechanical and Plumbing design services for renovation of 9,300 square foot Sand Point Public Library, Idaho.

CVAL-Gunter_Hotel.jpg

Gunter Hotel, San Antonio

Multi-discipline renovation of 168,000 square foot historical hotel in downtown San Antonio.

16-40.png

Legacy Villas

New Construction: Mechanical and Plumbing design services for new 35,000 square foot residential apartments and club house.

17-20 Pearson Packaging.jpg

Pearson Packaging

Remodel: Mechanical and Plumbing design services for 13,000 square foot office space remodel.
 

17-30.png

University of Idaho Residence Hall Dining Remodel

Remodel: Mechanical and Plumbing design services for 11,500 square foot dining hall/kitchen remodel.

17-62.png

Tulalip Elders Center Kitchen Expansion

Remodel/Expansion: Mechanical and Plumbing design services for 1,800 square kitchen remodel/expansion.

MSD-23.JPG

Pendleton RoundUp Retail Center

New Construction: Mechanical and Plumbing design services for new 18,400 square foot retail, ticketing, and offices.  
-8 Packaged Gas/Dx Rooftop units
-Exhaust fans
-Mini-split Dx cooling for Data

HEP-20-04_01.png

Union School District Renovations

Renovation: Mechanical and Plumbing budgeting and design services for district wide renovations; 62,000 square feet.
-Replace existing Steam Heat with Hydronic Hot Water and Heat 

HEP-21-05.jpg

Eastern Oregon Rest Stop Renovations

Renovation: Mechanical and Plumbing budgeting and design services for district wide renovations; 62,000 square feet.
-Replace existing electric furnaces
-Heat Recovery Ventilation

 

HEP-21-09.png

Private Residence Walla Walla

New Construction: New private residence; 9,500 square feet.
-Forced air systems
-Heat Recovery Ventilation
-Photovoltaic system
-Misc. exhaust systems

CVAL-Joshi_01.png

Private Residence Westlake Texas

New private residence; 22,000 square feet.

16-38.jpg

Shabby Fabrics

New Construction: Mechanical and Plumbing design services for new 17,500 square foot offices, warehouse, and production.

HEP-22-04.png

Truck Maintenance Shop Huntington Oregon

New Construction: Mechanical and plumbing design services for truck maintenance and repair shop

HEP-23-01-1.png

La Grande School District Chiller Installation

Project Description: 
Retrofit: MEP design services for the addition of campus chilled water system and central chiller plant.
 

HEP-24-01-1.png

Logston Brewery Mechanical And Plumbing Design

Renovation: Design of brewery plumbing systems and integration of new process equipment

​
 

HEP-24-02-1.png

Pacific NW Logistics Warehouses Mechanical And Plumbing Design

New Construction: Design of mechanical and plumbing systems for various logistics warehouses

HEP-24-08-1.jpeg

CAPECO TENNANT IMPROVEMENT     

Remodel: Mechanical and plumbing system replacements and modifications for social services offices and warehouse

HEP-25-03-1.png

Reali Vinyards Tasting Room

Renovation: Renovation of pole building into new wine tasting facility and barrel storage; 4,000 square feet.

HEP-25-09-2.png

Ryatt Construction Office Building

New Construction: Mechanical, Electrical, and plumbing engineering for new 8,000 square foot headquarters office building.

HEP-25-10-1.png

G6 Engineering LLC Office Building

New Construction: Mechanical and plumbing engineering for new 13,300 square foot headquarters office building.

HEP-26-02-1.png

Sagemoor Vinyards Tasting Room

Renovation: Renovation of wine tasting facility for new kitchen and conference spaces; 9,000 square feet.

HEP-26-03-1.png

Irrigon Business Incubator Retail Spaces

New Construction: New retail spaces building for small business start-ups; 5,000 square feet.

MECHANICAL

DSCN2233.jpg

Portland Public Schools Boiler Conversions

Retrofit: Mechanical design services for the conversion of boiler fuel oil burners to natural gas burners.

ISO-2.png

La Grande H.S. 
Mechanical Upgrades

Retrofit: Mechanical design services for the renovation of mechanical HVAC and plumbing systems.

HEP-18-03-2.png

La Grande Greenwood E.S. Upgrades

Retrofit: Mechanical design services for the renovation of mechanical HVAC systems.

HEP-18-03-3_edited.jpg

La Grande Island City E.S. Upgrades

Renovation: Controls, Electrical, Plumbing and Fire Sprinkler Performance design services for 63,000 square foot middle school.

HEP-18-03-4.png

La Grande Middle School Upgrades

​Retrofit: Mechanical design services for the renovation of mechanical HVAC systems.

DSC04179.JPG

Wells Fargo Bank Call Center Chiller Replacement

Retrofit: Mechanical design services for the replacement of central chillers.

ODOT-1.jpg

ODOT HVAC REPLACEMENT
R1 HEADQUARTERS

Retrofit: Mechanical design services for the replacement of Rooftop VAV/electric airhandlers.

HEP-18-06.png

CONRAD ROSE MANSION

Renovation: Mechanical design services for four story, 24,000 square foot office building and data room HVAC systems.

ACA-18-1.JPG

Philomath, Clemens Community Pool

Retrofit: Mechanical and Controls design services for the refurbishment of pool HVAC.
-Refurbishment and DDC controls for pool airhandler

HEP-18-02.png

Whitman College Anderson Hall HRV System

Retrofit: Mechanical and Controls design services for the replacement and relocation of restroom heat recovery ventilation systems.

MSD-24.JPG

Hedrick M.S. HVAC Remodel

Remodel: Mechanical and Controls design services for the replacement of 60,000 square foot middle school duct board ducting.

MSD-23.JPG

McLoughlin M.S. HVAC Remodel

Remodel: Mechanical and Controls design services for the replacement of 62,000 square foot middle school duct board ducting.

CWS-06.png

Clean Water Services Condenser Relocation

Retrofit: Mechanical design services for the relocation of refrigerant condensing equipment, In fluent Pump Station Cooling System.

RACI-1.png

Chemeketa Community College Santiam Boiler

Retrofit: Mechanical design services for the replacement of existing heating water boiler and ancillary equipment.

RACI-2.png

Chemeketa Community College Building #2 Boiler

Retrofit: Mechanical design services for the replacement of existing heating water boiler and ancillary equipment.

Pendleton Boiler Room 3D.png

​OREGON DAS Pendleton Office Building Boiler

Retrofit: Mechanical design services for the replacement of existing heating water boiler and boiler plant equipment.

HEP-17-02.png

Goodfellow Brothers Inc. Headquarters

Remodel: Mechanical design services for 11,000 square foot office building HVAC system. 

COS-11.JPG

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM

Retrofit: Mechanical design services for the replacement of central chillers.

HEP-17-03.jpg

SUPERIOR FRUIT

New Construction: Mechanical design services for 33,700 square foot office building and manufacturing facility HVAC system. 

HEP-17-04.png

EASTERN OREGON UNIVERSITY SNOW MELT EXPANSION

Renovation: Mechanical design services for renovation and expansion of 14,000 square foot snow melt system. 

ADW-06.JPG

Central Medford Steam Boiler Replacement

Retrofit: Replace existing fire tube steam boilers with new gas fired, sectional steam boilers.

HEP-19-01.png

OREGON DAS Pendleton Office Building HVAC

​Renovation: Replace existing HVAC system with new.

HEP-18-07.png

Force Majeure Winery

Calculations and Compliance: Heat load calculations and code compliance documentation.

HEP-19-04.JPG

Enterprise School District Facilities Assessment

Facilities Condition Assessment: Work as part of a team to provide Oregon Department of Education (ODE)

HEP-20-01.jpg

Enterprise School District Long Range Facility Plan

Budgeting: Facilities evaluation and cost estimating for Long Range Facility Planning.

HEP-20-03.png

Shaver Transportation Offices

New Construction: Mechanical HVAC design services for new 3,600 square foot office building.  

-17 zone Split System VRF
-Heat Recovery Ventilation
-Miscellaneous Electric Heaters

HEP-21-02.png

Walla Walla Valley Academy Lodge

New Construction: Mechanical and Plumbing design services for mountain lodge; 12,400 square feet.
-Forced air furnaces
-Miscellaneous exhaust systems
-Gas piping

HEP-21-03.jpg

​City of La Grande City Hall

HVAC Upgrades: Mechanical calculations and specification for HVAC upgrades; 22,500 square feet. 
-Split System Multizone Heat Pumps
-Heat Recovery Ventilation
-Heat load calculations
-Construction specifications

HEP-21-04.png

Associated Veterinary Medical Center

Upgrades: Expansion/renovation and associated Mechanical HVAC design services; 5,000 square feet.
-Rooftop airhandler
-Exhaust fans
-Unit Heaters
-Building Heat Load Calculations

HEP-21-06.png

Telstra Tennant Improvements

Tennant Improvements: Mechanical design services for office building renovation; 6,000 square meteres.
-Rezoning and ducting to accommodate new floor plans
-Heat load calculations
-Miscellaneous exhaust systems

HEP-21-07.jpg

Milton-Freewater High School Gym HVAC

Renovation: Mechanical design services for HVAC renovation; 38,000 square feet.
-Replace steam heat with Natural Gas Furnaces
-Variable speed drives
-New packaged rooftop equipment 

HEP-21-08.png

Sustainable Timber Tasmania Expansion

Renovation and New Construction: Mechanical design services for office building renovation and expansion; 746 square meteres.
-Multizone Split System Heat Pumps
-Heat Recovery Ventilation System

HEP-21-10.png

Winery Expansion - Wine Tasting Area

Renovation: New wine tasting area; 2,200 square feet.
-Forced air heat pump system
-Misc. exhaust systems
-Domestic hot water
-Building Heat Load Calculations

HEP-21-11.png

Private Residence

New Construction: New private residence; 2,200 square feet.
-Split System heat pump
-Heat Recovery ventilation
-Domestic hot water

 

HEP-21-13.JPEG

Weston Middle School Classroom HVAC

Renovation: HVAC upgrade for classroom spaces; 2,700 square feet.
-Packaged multizone HVAC system
-Controls schematics
-Specifications package

HEP-21-15.png

Island City School Remodel

Remodel: Computer classroom with storage remodel.  HVAC modifications and controls to existing; 15,000 square feet.
-Rezoning for existing HVAC system
-Modifications to central boiler 

HEP-22-01.png

Union County Law Enforcement Chiller Replacement

Retrofit: Mechanical design services for the replacement of central chiller.

HEP-22-02.JPEG

Union School District Seismic Retrofit

Retrofit: Mechanical design services for the seismic retrofit of structural elements

HEP-22-06-1.jpg

Joseph School Construction Cost Estimating

Assessment: Evaluation of existing mechanical systems conditions. Proposal and constrution cost estimation of options for 165,000 square foot elementary and high school.

HEP-23-02-1.png

Joseph School Heating System Replacement

Renovation: Mechanical design services for 42,000 square foot school.

HEP-23-03-1.jpg

Business Office Renovation

Renovation: Mechanical design services for 5,000 square foot office spaces.

HEP-24-09-1.png

Union County Law Enforcement Air Distribution

Remodel: Air terminal sizing and placement for remodel of office areas on 26,000 square foot law enforcement building.

HEP-25-01-1.png

Umatilla Fire Station Gas Line Sizing

Analysis: Emergency generator natural gas line sizing

HEP-25-08-1.png

Five Dollar Ranch Brewing

New Construction: Value engineering for HVAC system of brewery process area, public tasting, and kitchen; 7,300 sqaure feet.

HEP-26-04-1.png

Athena-Weston School District Construction Cost Estimating

Assessment: Evaluation of existing mechanical systems conditions. Constrution cost estimation of HVAC replacement for middle and high school; total 50,000 square feet.

MEDICAL / INDUSTRIAL

HEP-18-04.jpg

Saint Anthony Hospital USP-40 Pharmacy Update

Renovation: Mechanical HVAC design services for USP-40 / NF-35 update to pharmacy hazardous drug compounding areas.

IMG_0979.JPG

EOU Loso Hall Exhaust System Improvements

Renovation: Mechanical HVAC design services for industrial exhaust system remediation/replacement including foundry, welding, ceramics, kilns, paint, and printmaking.

MEP.png

Whitman College Physics Dept. Laser Engraver

Design: Direct exhaust system for new laser engraver.

Oregon Coast Glass.jpg

Oregon Coast Glass Works

Analysis: Code analysis of glass blowing/forming facility; NFPA 54

Untitled-2.jpg

Garland Animal Clinic

Design: Oxygen and Waste Anesthetic Gas Disposal systems; NFPA 99 and 704, IFC

Wenatchee-Pediatric-.jpg

Wenatchee Pediatric Dentistry

Renovation: Mechanical, Plumbing, and Medical Gas design services for 8,300 square foot pediatric dental office.

Entek.jpg

Entek Manufacturing

Tasks and Duties:

P&ID.JPG

Linde - Industrial Gases

Drafting: Drawing updates for CO2 system Process and Instrumentation Diagrams

ODFW.jpg

ODFW Vetrinary Laboratory Improvements

Renovation: Renovation and expansion of 1,500 square foot existing office spaces and veterinary/research laboratory. 

fire-icon.jpg

Furniture Restoration Center

Analysis: Code analysis of furniture spray facility; NFPA 704, NFPA 15, and NFPA 33

MEP.png

Umatilla Electric Cooperative Substation

Calculations: Cooling load calculations on electrical sub-station.

HEP-21-12.png

Boubleback Winery Barrel Storage

​New Construction: New wine barrel storage and shipping office; 5,400 square feet.

HEP-23-04-1.png

Army Core of Engineers Pump Station

New: Mechanical design services for pump station in Umatilla

HEP-24-05-1.png

Army Core of Engineers Pump Station

New: Irrigation cooperative 16,000 horse power pump station and electrical enclosure

COMMISSIONING

DSCN2233.jpg

SOU Churchill Hall Commissioning

Renovation: Commissioning services for remodeled 86-year-old Southern Oregon University Churchill Hall.   $6.4 million renovation, 32,000 square feet, 3-stories.

ISO-2.png

Ashland School District High School Commissioning

Renovation and New Construction: Commissioning services for renovation of Ashland High School HVAC upgrades and new Gymnasium and classroom spaces.

HEP-18-03-2.png

Eugene State Office Building

Renovation and New Construction: Commissioning services for four story, 32,000 square foot state office building.  1102 Lincoln Street, Eugene, Oregon

HEP-18-03-3_edited.jpg

Oregon State Police Crime Laboratory

Renovation: Commissioning services for 8,720 square foot state police crime laboratory and offices.  Clackamas, Oregon

HEP-18-03-4.png

North Medford High School

Renovation and New Construction: Commissioning services for 250,000 square foot high school mechanical upgrades.  Medford, Oregon

DSC04179.JPG

South Medford High School

Renovation and New Construction: Commissioning services for 250,000 square foot high school mechanical upgrades.  Medford, Oregon

ODOT-1.jpg

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM

Retrofit: Commissioning services for the replacement of central chillers.

HEP-18-06.png

Grande Ronde
Hospital USP-797
Pharmacy Update

​Retrofit: Commissioning services for USP-797 remodel to pharmacy and drug compounding areas.

ACA-18-1.JPG

Da Vinci Middle School

Mechanical Controls Upgrades: Commissioning services for 84,000 square foot middle school.  Portland, Oregon

HEP-18-02.png

Russell Academy

Renovation: Commissioning services for 32,500 square foot elementary school.  Portland, Oregon

MSD-24.JPG

Oak Grove Elementary

New Construction & Renovation: Commissioning services for 22,700 square foot elementary school.  Medford, Oregon

MSD-23.JPG

​Lone Pine Elementary

New Construction & Renovation: Commissioning services for 51,900 square foot elementary school.  Medford, Oregon

MSD-23.JPG

Jackson Elementary

New Construction & Renovation: Commissioning services for 51,900 square foot elementary school.  Medford, Oregon

MSD-23.JPG

Roosevelt Elementary

New Construction & Renovation: Commissioning services for 51,000 square foot elementary school.  Medford, Oregon

MSD-23.JPG

North Medford H.S. Media Center

New Construction: Commissioning services for 20,000 square foot media center.  Medford, Oregon

MSD-23.JPG

Union School District HS Commissioning

Renovation: Commissioning services for Mechanical and Plumbing budgeting and design services for

ENERGY

HEP-20-10.png

Providence Medical Center Chiller Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for DDC controls re-programming, mechanical work for system optimization, variable speed...

WU-74-1.jpg

Willamette University Central Steam Heat System

Analysis: Energy model and life cycle cost (LCC) analysis for central steam heating system (700 boiler horsepower, 543,000 square foot campus system).

HEP-19-07.JPG

Joseph School Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC energy improvements on 74,000 square foot K-12 school campus.

MOB PARTIAL.png

Providence Saint Vincent MOB3 Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report

IMG_6813.JPG

Whitman College Baker Center

Analysis: Energy model and Retro-Commissioning Report analysis for 9,700 square foot office space.

COS-11b.png

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM

Analysis: Energy model and life cycle cost (LCC) analysis for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.

HEP-17-07.jpg

ANTOINETTE HATFIELD HALL

Analysis: Energy analysis for potential EcoRoof (Green Roof) on 137,000 square foot performing arts theater and offices.

MEP.png

Clatsop County Public Services Building

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC upgrade for 14,000 square foot office space.

HEP-19-02.jpg

BMCC Columbia Hall Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC energy improvements on 15,500 square foot community college building.

HEP-19-03.jpg

Umatilla HS Water Loop Heat Exchanger

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Energy analysis for replacing plate and frame heat exchanger.

HEP-19-05.JPG

Enterprise School Site Evaluation

Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report.  Assessment of energy consuming equipment and potential energy savings measures.

HEP-19-06.jpg

Geiser Grande Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC and plumbing energy improvements on 37,900 square foot hotel and restaurant.

BC-10-1.jpg

HISTORIC BENTON COUNTY CIRCUIT COURT HOUSE

Analysis: Energy model and life cycle cost (LCC) analysis for hydronic geothermal heating system for 28,000 square foot courthouse and offices.

HEP-19-08.png

Figgins Family Wine Estates Production and Tasting

​Calculations and Compliance: Heat load calculations and code compliance documentation.

HEP-19-13.png

Union County Law Enforcement Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC controls improvements on 26,000 square foot law enforcement offices and jail.

HEP-20-02.png

The Walls Winery

Calculations and Compliance: Heat load calculations and code compliance documentation.
-Heat load calculations and Sate of Washington Energy Code compliance documentation for tasting room, kitchen, office spaces, storage, and lab.

HEP-20-05.png

Baker County Library Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC controls improvements on 15,800 square foot library.

HEP-20-06.png

Providence Process Chiller Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for process chilled water system improvements
-OpenStudio / EnergyPlus model of building energy

HEP-19-14.jpg

Pendleton Center for the Arts Site Evaluation

Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report (ASHRAE Level I).  Assessment of energy consuming equipment and potential energy savings measures.

HEP-21-14.png

Private Residence Walla Walla

New Construction: New Net-Zero private residence; 9,500 square feet.
-Forced air systems
-Radiant floors
-Heat Recovery Ventilation
-Photovoltaic system

HEP-21-16.png

9 West Alder Salon

Tennant Improvements: Mechanical, Lighting; 980 square feet.
-Ventilation and associated controls
-Electrical and Lighting and controls
-Washington State Energy Code Compliance documentation (Envelope, Mechanical, Electrical)

ACA-19-1.jpg

Philomath, Clemens Community Pool Solar Analysis

Analysis: Energy model and life cycle cost (LCC) analysis for pool solar retrofit purchasing options (100,000 gallon pool).

ETO-14-1.JPG

Oregon Cascades West Council of Governments

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report analysis for HVAC upgrade for 34,000 square foot office space.

Doubleback Winery.png

Doubleback Winery Barrel Storage

​Calculations and Compliance: Heat load calculations and code compliance documentation.

HEP-24-04-ANSYS_edited.jpg

Private Residence - Washington Container House

Calculations and Compliance: Heating and Cooling load calculations and code compliance documentation.

RACI-09CWS_2.png

Waste Water Treatment Energy Model

​Computational model for simulation, analysis, and prediction a waste water treatment plant process heating energy consumption

CVAL-Gehring_01.png

Gould Academy Dormitory

Energy audit (ASHRAE Level II), energy model, and cost benefit analysis for variable refrigerant flow heating and cooling system for 31,000 square foot dormitory.

CVAL-Tivona_02.png

Wedding Event Center- Dallas

Optimization of design for Energy savings.

HEP-23-03-1.jpg

Private Residence Walla Walla​

New Construction: Mechanical design services for custom single family home

HEP-22-05-1.png

Private Residence Walla Walla

New Construction: Mechanical design services for custom single family home

HEP-22-05-1.png

Private Residence Walla Walla

New Construction: Mechanical design services for custom single family home

HEP-24-06-1.jpg

Grant Union School ASHRAE Level 2 Energy Audit

Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy’s Renew America’s School and Oregon Department of Education

HEP-24-07-1.png

Grocery Store Ventilation

New Construction: Specification of heat recovery ventilation system for small grocery store.

HEP-25-02-1.png

Religious Retail Sales Building

New Construction: New retail sales and storage building for church community; 5,500 square feet.

HEP-25-04-1.png

Private Residence Walla Walla

New Construction: Mechanical design services for custom single family home

HEP-25-05-1.png

ReSustain LTD Energy Model

Analysis: Energy modeling services for commercial office building

HEP-25-06-1.jpg

Tillamook Liberty ES ASHRAE Level 2 Energy Audit

Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy’s Renew America’s School and Oregon Department of Education

HEP-25-07-1.png

Tillamook Liberty JHS ASHRAE Level 2 Energy Audit

Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy’s Renew America’s School and Oregon Department of Education

HEP-25-11-1.png

Private Residence Walla Walla

New Construction: Washington State Energy Code consulting services for custom single family home

PLUMBING

HEA-01-1.JPG

Willamette University Athletic Center Renovation

Renovation: Plumbing design services for remodeling 10,500 square foot, 3-story fitness center, pool, locker rooms and offices.

TBCC.jpg

Tillamook Bay Community College

New Construction: Plumbing design services for construction of 9,300 square foot community college.

17-54.png

Fitness NW

Renovation: Plumbing design and HVAC load calculations for construction of 12,400 square foot exercise facility.

OPR-01.png

Thompson's Mills State Heritage Site

Renovation: 215,000 square foot RV,camping, facilities, and museum site well water distribution system.

HEP-18-08.png

Grand Hyatt, San Antonio

Retrofit: Domestic water and sanitary sewer system for new central chiller plant

HEP-26-01-1.png

Suncadia Resort Restaurants Plumbing Systems

New Construction: Plumbing systems engineering for resort restaurants and food court; 4,200 square feet.