New Construction: Mechanical and Plumbing design services for new 18,400 square foot retail, ticketing, and offices.
-8 Packaged Gas/Dx Rooftop units
-Exhaust fans
-Mini-split Dx cooling for Data
Renovation: Mechanical and Plumbing budgeting and design services for district wide renovations; 62,000 square feet.
-Replace existing Steam Heat with Hydronic Hot Water and Heat
Renovation: Mechanical and Plumbing budgeting and design services for district wide renovations; 62,000 square feet.
-Replace existing electric furnaces
-Heat Recovery Ventilation
New Construction: Mechanical and Plumbing design services for mountain lodge; 12,400 square feet.
-Forced air furnaces
-Miscellaneous exhaust systems
-Gas piping
Tennant Improvements: Mechanical design services for office building renovation; 6,000 square meteres.
-Rezoning and ducting to accommodate new floor plans
-Heat load calculations
-Miscellaneous exhaust systems
Renovation and New Construction: Mechanical design services for office building renovation and expansion; 746 square meteres.
-Multizone Split System Heat Pumps
-Heat Recovery Ventilation System
Renovation: New wine tasting area; 2,200 square feet.
-Forced air heat pump system
-Misc. exhaust systems
-Domestic hot water
-Building Heat Load Calculations
Remodel: Computer classroom with storage remodel. HVAC modifications and controls to existing; 15,000 square feet.
-Rezoning for existing HVAC system
-Modifications to central boiler
Assessment: Evaluation of existing mechanical systems conditions. Proposal and constrution cost estimation of options for 165,000 square foot elementary and high school.
Athena-Weston School District Construction Cost Estimating
Assessment: Evaluation of existing mechanical systems conditions. Constrution cost estimation of HVAC replacement for middle and high school; total 50,000 square feet.
Renovation: Mechanical HVAC design services for industrial exhaust system remediation/replacement including foundry, welding, ceramics, kilns, paint, and printmaking.
Providence Medical Center Chiller Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for DDC controls re-programming, mechanical work for system optimization, variable speed...
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 74,000 square foot K-12 school campus.
Analysis: Energy model and life cycle cost (LCC) analysis for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 15,500 square foot community college building.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC and plumbing energy improvements on 37,900 square foot hotel and restaurant.
Union County Law Enforcement Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 26,000 square foot law enforcement offices and jail.
Calculations and Compliance: Heat load calculations and code compliance documentation.
-Heat load calculations and Sate of Washington Energy Code compliance documentation for tasting room, kitchen, office spaces, storage, and lab.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 15,800 square foot library.
Providence Process Chiller Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for process chilled water system improvements
-OpenStudio / EnergyPlus model of building energy
Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report (ASHRAE Level I). Assessment of energy consuming equipment and potential energy savings measures.
New Construction: New Net-Zero private residence; 9,500 square feet.
-Forced air systems
-Radiant floors
-Heat Recovery Ventilation
-Photovoltaic system
Tennant Improvements: Mechanical, Lighting; 980 square feet.
-Ventilation and associated controls
-Electrical and Lighting and controls
-Washington State Energy Code Compliance documentation (Envelope, Mechanical, Electrical)
Energy audit (ASHRAE Level II), energy model, and cost benefit analysis for variable refrigerant flow heating and cooling system for 31,000 square foot dormitory.
Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy’s Renew America’s School and Oregon Department of Education
Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy’s Renew America’s School and Oregon Department of Education
Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy’s Renew America’s School and Oregon Department of Education