Assessment: Evaluation of existing mechanical systems conditions. Proposal and Construction cost estimation of options for 165,000 square foot elementary and high school.
Athena-Weston School District Construction Cost Estimating
Assessment: Evaluation of existing mechanical systems conditions. Construction cost estimation of HVAC replacement for middle and high school; total 50,000 square feet.
Renovation: Mechanical HVAC design services for industrial exhaust system remediation/replacement including foundry, welding, ceramics, kilns, paint, and printmaking.
Industrial: Process and mechanical engineering for manufacturing equipment, including P&IDs, air strippers, curing ovens, flash distillation and plant air quality systems, plus field installation and commissioning.
Renovation and New Construction: Commissioning services for four story, 32,000 square foot state office building at 1102 Lincoln Street, Eugene, Oregon.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 74,000 square foot K-12 school campus.
City of Salem Civic Center Chiller Energy Analysis
Analysis: Energy model and life cycle cost (LCC) analysis for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 15,500 square foot community college building.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC and plumbing energy improvements on 37,900 square foot hotel and restaurant.
Union County Law Enforcement Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 26,000 square foot law enforcement offices and jail.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 15,800 square foot library.
Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report (ASHRAE Level I). Assessment of energy consuming equipment and potential energy savings measures.
Energy audit (ASHRAE Level II), energy model, and cost benefit analysis for variable refrigerant flow heating and cooling system for 31,000 square foot dormitory.
Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy's Renew America's School and Oregon Department of Education
Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy's Renew America's School and Oregon Department of Education
Analysis: Facilities energy efficiency evaluation, identification of energy efficiency measures, calibrated energy modeling, cost estimating, and energy cost savings. Department of Energy's Renew America's School and Oregon Department of Education
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for occupancy-based airflow setback in five cardiovascular laboratories served by a recirculating VAV air handler with hydronic reheat.
Providence Medical Center Chiller Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report for chilled water plant optimization, variable speed condenser water, and a fourth chiller and tower.