top of page

Garland Animal Clinic

Design: Oxygen and Waste Anesthetic Gas Disposal systems; NFPA 99 and 704, IFC

  • Layout, safeties, and line sizing for O2 and WAGD systems

  • Analysis of NFPA requirements for exterior storage of O2 in relation to capacity, property lines, and combustible construction

Design: Oxygen and Waste Anesthetic Gas Disposal systems; NFPA 99 and 704, IFC.

Project Team

 

OWNER: GARLAND ANIMAL CLINIC
1022 W Garland Ave
Spokane, WA 99205
Tony Layton, Construction Manager, Build Smart NW, Inc.
P: 509-342-9117

 

ENGINEER: KARTCHNER ENGINEERING
6814 S. Jackson Ridge Lane
Greenacres, WA 99016
Michael Lovejoy, PE
Yauheni Dounar
Mark Kartchner, PE (Engineer of Record)
P: 509-922-0383

bottom of page