City of Salem Civic Center Chiller Energy Analysis

Analysis: Energy model and life cycle cost (LCC) analysis (Focused Study) for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.

  • DOE2 eQuest model of building energy consumption calibrated with interview and utility data

  • Construction, Operation, and Maintenance cost estimating

  • Life cycle cost analysis using Department of Energy BLCC5 (Federal Life Cycle Cost Methodology and Procedures)

  • Evaluation of first and life time cost for multiple retrofit options:

  • Multiple Chiller options: Multistage Scroll, S&T Multistage Scroll, VSD Oilless Centrifugal, VSD Centrifugal, VSD Screw

  • Option for variable flow chilled water pumps and valves

  • Multiple Cooling Tower options: Open Galvanized, Open Stainless VSD, Closed Stainless VSD

Analysis: Energy model and life cycle cost (LCC) analysis for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.

Project Team

 

OWNER: CITY OF SALEM (OREGON)
1580 20th Street SE, Bldg. #24 Salem, OR 97302-1254
Bob Miller, Project Manager
Luke Bergerson, Operations Supervisor
P: 503-588-6255

 

ANALYSIS: ENVIRONMENTAL & ENGINEERING SERVICES INC (EESI)
917 NW Grant Avenue Corvallis, OR 97330
Michael Lovejoy, PE
Fred Shaub, PE
P: 541-754-1062