Providence Medical Center Chiller Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for DDC controls re-programming, mechanical work for system optimization, variable speed...
Analysis: Energy model and life cycle cost (LCC) analysis for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 15,500 square foot community college building.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC and plumbing energy improvements on 37,900 square foot hotel and restaurant.
Union County Law Enforcement Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 26,000 square foot law enforcement offices and jail.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 74,000 square foot K-12 school campus.
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 15,800 square foot library.
Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report (ASHRAE Level I). Assessment of energy consuming equipment and potential energy savings measures.
Energy audit (ASHRAE Level II), energy model, and cost benefit analysis for variable refrigerant flow heating and cooling system for 31,000 square foot dormitory.