top of page
Providence Medical Center Chiller Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for DDC controls re-programming, mechanical work for system optimization, variable speed...

Willamette University Central Steam Heat System
Willamette University Central Steam Heat System

Analysis: Energy model and life cycle cost (LCC) analysis for central steam heating system (700 boiler horsepower, 543,000 square foot campus system).

HISTORIC BENTON COUNTY CIRCUIT COURT HOUSE
HISTORIC BENTON COUNTY CIRCUIT COURT HOUSE

Analysis: Energy model and life cycle cost (LCC) analysis for hydronic geothermal heating system for 28,000 square foot courthouse and offices.

Oregon Cascades West Council of Governments
Oregon Cascades West Council of Governments

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report analysis for HVAC upgrade for 34,000 square foot office space.

Whitman College Baker Center
Whitman College Baker Center

Analysis: Energy model and Retro-Commissioning Report analysis for 9,700 square foot office space.

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM
CITY OF SALEM CIVIC CENTER CHILLER SYSTEM

Analysis: Energy model and life cycle cost (LCC) analysis for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.

ANTOINETTE HATFIELD HALL
ANTOINETTE HATFIELD HALL

Analysis: Energy analysis for potential EcoRoof (Green Roof) on 137,000 square foot performing arts theater and offices.

Clatsop County Public Services Building
Clatsop County Public Services Building

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC upgrade for 14,000 square foot office space.

BMCC Columbia Hall Technical Analysis Study
BMCC Columbia Hall Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC energy improvements on 15,500 square foot community college building.

Umatilla HS Water Loop Heat Exchanger
Umatilla HS Water Loop Heat Exchanger

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Energy analysis for replacing plate and frame heat exchanger.

Enterprise School Site Evaluation
Enterprise School Site Evaluation

Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report.  Assessment of energy consuming equipment and potential energy savings measures.

Geiser Grande Technical Analysis Study
Geiser Grande Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC and plumbing energy improvements on 37,900 square foot hotel and restaurant.

Joseph School Technical Analysis Study
Joseph School Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC energy improvements on 74,000 square foot K-12 school campus.

Figgins Family Wine Estates Production and Tasting
Figgins Family Wine Estates Production and Tasting

Calculations and Compliance: Heat load calculations and code compliance documentation.

Union County Law Enforcement Technical Analysis Study
Union County Law Enforcement Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC controls improvements on 26,000 square foot law enforcement offices and jail.

The Walls Winery
The Walls Winery

Calculations and Compliance: Heat load calculations and code compliance documentation.


-Heat load calculations and Sate of Washington Energy Code compliance documentation for tasting room, kitchen, office spaces, storage, and lab.

Baker County Library Technical Analysis Study
Baker County Library Technical Analysis Study


Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for HVAC controls improvements on 15,800 square foot library.

Providence Process Chiller Technical Analysis Study
Providence Process Chiller Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.  Analysis for process chilled water system improvements

-OpenStudio / EnergyPlus model of building energy

Pendleton Center for the Arts Site Evaluation
Pendleton Center for the Arts Site Evaluation

Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report.  Assessment of energy consuming equipment and potential energy savings measures.

 

HEP-21-14.png
Private Residence Walla Walla

New Construction: New Net-Zero private residence; 9,500 square feet.
 

-Forced air systems
-Radiant floors
-Heat Recovery Ventilation
-Photovoltaic system

HEP-21-16.png
9 West Alder Salon

Tennant Improvements: Mechanical, Lighting; 980 square feet.
 

-Ventilation and associated controls
-Electrical and Lighting and controls

-Washington State Energy Code Compliance documentation (Envelope, Mechanical, Electrical)

 Philomath, Clemens Community Pool Solar Analysis
Philomath, Clemens Community Pool Solar Analysis

Analysis: Energy model and life cycle cost (LCC) analysis for pool solar retrofit purchasing options (100,000 gallon pool).

bottom of page