Wenatchee Pediatric Dentistry
Renovation: Mechanical, Plumbing, and Medical Gas design services for 8,300 square foot pediatric dental office.
VRF System with Heat Recovery
Heat Recovery Ventilation
Plumbing
Medical Gas Systems (Medical Air, Waste Anesthetic Gas Disposal (WAGD), Nitrous Oxide, Oxygen) (NFPA 99, 704, IFC)

Project Team
CONSTRUCTION MANAGER: BAKER CONSTRUCTION & DEVELOPMENT INC.
2711 E Sprague Ave, Spokane, WA 99202
Brandon Spackman, Construction Manager
P: 509-535-3668
M&P ENGINEER: KARTCHNER ENGINEERING
6814 S. Jackson Ridge Lane Greenacres, WA 99016
Michael Lovejoy, PE
Yauheni Dounar
Mark Kartchner, PE (Engineer of Record)
P: 509-922-0383
ARCHITECT: BAYLIS ARCHITECTS
10801 Main Street, Suite 110 Bellevue, WA 98004
Meredith Everist, AIA
Sam Chung
P: 425-454-0566
INTERIOR DESIGN: DANNIX DESIGN
218 MAIN STREET, #713 Kirkland, Washington
Dan Nix
Cheryl Lewis
P: 425-828-0355
STRUCTURAL ENGINEER: ECLIPSE ENGINEERING
Brian Hanson, PE
P: 509-921-7731