Wells Fargo Bank Call Center Chiller Replacement

Retrofit: Mechanical design services for the replacement of central chillers.

  • Two hydronic chillers, 750 tons total capacity

  • Code compliance updates

  • Additional safety controls and interlocks with existing equipment

Retrofit: Mechanical design services for the replacement of central chillers.

Project Team

 

OWNER: WELLS FARGO BANK
18700 Walker Road Beaverton, OR 97123
Owner's Rep: Robert Brimer, Lead Operating Engineer (CBRE)
P: 1-800-869-3557

 

CHILLER SYSTEM ENGINEERING: ENVIRONMENTAL & ENGINEERING SERVICES INC (EESI)
687 N.W. 5th Street Corvallis, OR 97330
Michael Lovejoy, PE
George Gilbert
P: 541-754-1062

 

ELECTRICAL ENGINEERING: TRIAXIS ENGINEERING, INC.
301 NE 117th Ave. Vancouver, WA 98684
Mike Beanland, PE
P: 360-260-3900