top of page

Providence Saint Vincent MOB3 Technical Analysis Study

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for DDC controls and fan upgrades.

  • OpenStudio / EnergyPlus model of building energy consumption calibrated with interview and utility data.

  • Evaluation of first cost and simple payback for:

  • Replace existing vane-axial fans with plug fans and variable speed drives

  • Removal of mist eliminators and sound traps for system static pressure reduction

  • Implement zone level DDC controls upgrade on VAV boxes with scheduling, night setback, unoccupied zero flow, and fan system pressure reset strategy.

Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report.

Project Team

 

OWNER: PROVIDENCE PORTLAND MEDICAL CENTER
4805 NE Glisan Street Portland, Oregon 97213
Willy Heston, Facilities Manager
P: 503-215-1111

 

ANALYSIS: HELIX ENERGY PARTNERS LLC
113 Main Street, Helix, OR 97835
Michael Lovejoy, PE
P: 541-379-0271

 

ETO PROGRAM MANAGEMENT CONTRACTOR: ICF
615 SW Alder Street Portland, OR 97103
Alex Inman, Account Manager
P: 503-525-6140

Helix Energy Partners Logo BW

+1-541-379-0271

Copyright© 2016 von Helix Energy Partners LLC  Helix, Oregon | Terms & amp; Bedingungen  | Datenschutz-Bestimmungen

bottom of page