City of Salem Civic Center Chiller Energy Analysis
Analysis: Energy model and life cycle cost (LCC) analysis (Focused Study) for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.
DOE2 eQuest model of building energy consumption calibrated with interview and utility data
Construction, Operation, and Maintenance cost estimating
Life cycle cost analysis using Department of Energy BLCC5 (Federal Life Cycle Cost Methodology and Procedures)
Evaluation of first and life time cost for multiple retrofit options:
Multiple Chiller options: Multistage Scroll, S&T Multistage Scroll, VSD Oilless Centrifugal, VSD Centrifugal, VSD Screw
Option for variable flow chilled water pumps and valves
Multiple Cooling Tower options: Open Galvanized, Open Stainless VSD, Closed Stainless VSD

Project Team
OWNER: CITY OF SALEM (OREGON)
1580 20th Street SE, Bldg. #24 Salem, OR 97302-1254
Bob Miller, Project Manager
Luke Bergerson, Operations Supervisor
P: 503-588-6255
ANALYSIS: ENVIRONMENTAL & ENGINEERING SERVICES INC (EESI)
917 NW Grant Avenue Corvallis, OR 97330
Michael Lovejoy, PE
Fred Shaub, PE
P: 541-754-1062
