top of page

Willamette University Central Steam Heat System

Analysis: Energy model and life cycle cost (LCC) analysis for central steam heating system (700 boiler horsepower, 543,000 square foot campus system).

  • Excel linear regression model of campus energy consumption using interview, utility, and TMY3 data

  • Construction, Operation, and Maintenance cost estimating

  • Life cycle cost analysis using Department of Energy BLCC5 (Federal Life Cycle Cost Methodology and Procedures)

  • Evaluation of first and life time cost for central steam system vs. decentralized condensing boilers

Analysis: Energy model and life cycle cost (LCC) analysis for central steam heating system (700 boiler horsepower, 543,000 square foot campus system).

Project Team

 

OWNER: WILLAMETTE UNIVERSITY
900 State Street Salem, OR 97301
Owner's Rep: Jan Gardner, Gary Grimm
P: 503-370-6300

 

ANALYSIS: ENVIRONMENTAL & ENGINEERING SERVICES INC (EESI)
687 N.W. 5th Street Corvallis, OR 97330
Michael Lovejoy, PE
P: 541-754-1062

Helix Energy Partners 로고 BW

+1-541-379-0271

Copyright© 2016 by Helix Energy Partners LLC  헬릭스, 오리건 | 이용약관  | 개인 정보 정책

bottom of page