top of page

Wenatchee Pediatric Dentistry

Renovation: Mechanical, Plumbing, and Medical Gas design services for 8,300 square foot pediatric dental office.

  • VRF System with Heat Recovery

  • Heat Recovery Ventilation

  • Plumbing

  • Medical Gas Systems (Medical Air, Waste Anesthetic Gas Disposal (WAGD), Nitrous Oxide, Oxygen) (NFPA 99, 704, IFC)

Renovation: Mechanical, Plumbing, and Medical Gas design services for 8,300 square foot pediatric dental office.

Project Team

 

CONSTRUCTION MANAGER: BAKER CONSTRUCTION & DEVELOPMENT INC.
2711 E Sprague Ave, Spokane, WA 99202
Brandon Spackman, Construction Manager
P: 509-535-3668

 

M&P ENGINEER: KARTCHNER ENGINEERING
6814 S. Jackson Ridge Lane Greenacres, WA 99016
Michael Lovejoy, PE
Yauheni Dounar
Mark Kartchner, PE (Engineer of Record)
P: 509-922-0383

 

ARCHITECT: BAYLIS ARCHITECTS
10801 Main Street, Suite 110 Bellevue, WA 98004
Meredith Everist, AIA
Sam Chung
P: 425-454-0566

 

INTERIOR DESIGN: DANNIX DESIGN
218 MAIN STREET, #713 Kirkland, Washington
Dan Nix
Cheryl Lewis
P: 425-828-0355

 

STRUCTURAL ENGINEER: ECLIPSE ENGINEERING
Brian Hanson, PE
P: 509-921-7731

Helix Energy Partners 로고 BW

+1-541-379-0271

Copyright© 2016 by Helix Energy Partners LLC  헬릭스, 오리건 | 이용약관  | 개인 정보 정책

bottom of page