Providence Saint Vincent MOB3 Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for DDC controls and fan upgrades.
OpenStudio / EnergyPlus model of building energy consumption calibrated with interview and utility data.
Evaluation of first cost and simple payback for:
Replace existing vane-axial fans with plug fans and variable speed drives
Removal of mist eliminators and sound traps for system static pressure reduction
Implement zone level DDC controls upgrade on VAV boxes with scheduling, night setback, unoccupied zero flow, and fan system pressure reset strategy.

Project Team
OWNER: PROVIDENCE PORTLAND MEDICAL CENTER
4805 NE Glisan Street Portland, Oregon 97213
Willy Heston, Facilities Manager
P: 503-215-1111
ANALYSIS: HELIX ENERGY PARTNERS LLC
113 Main Street, Helix, OR 97835
Michael Lovejoy, PE
P: 541-379-0271
ETO PROGRAM MANAGEMENT CONTRACTOR: ICF
615 SW Alder Street Portland, OR 97103
Alex Inman, Account Manager
P: 503-525-6140