SOU Churchill Hall Commissioning

Renovation: Commissioning services for remodeled 86-year-old Southern Oregon University Churchill Hall.   $6.4 million renovation, 32,000 square feet, 3-stories.

-Steam/Heating water Converters with Submetering
-VAV Air Handling Equipment
-Heat Recovery Ventilation
-Unit Ventilators
-Exhaust Fans
-Domestic Hot Water Circulation System
-Interface with Central Plant Chilled Water System
-Lighting Controls
-HVAC fire/smoke alarm interface
-Full DDC Building Automation System with advanced Energy Conservation Controls (Night Low Limits, Optimal Start, Occupancy Setback with HVAC and Lighting, Heat Recovery Optimization, Demand Controlled Heating and Cooling Water System, Demand Controlled Ventilation, Electrical Utility Monitoring/Metering)

OWNER: SOUTHERN OREGON UNIVERSITY
351 Walker Ave. Ashland, OR 97520
Owner's Rep: Jim McNamara, Drew Gilliland, Keith Beed
P: 541.552.6888

Ashland School District High School Commissioning

Renovation and New Construction: Commissioning services for renovation of Ashland High School HVAC upgrades and new Gymnasium and classroom spaces.

-2 New central condensing boilers and tie in with existing primary/secondary hydronics
-3 New condensing boilers for gymnasium/classrooms/offices
-Condensing hot water heater w/ domestic hot water circulation system
-New air cooled chiller and tie in with existing hydronics
-Multiple exhaust fans, pumps, and convectors
-2 Locker room heat recovery units with run around loop
-6 Multizone VAV air handling units    
-7 Constant volume air handling units
-2 Variable air volume air handling units with associated terminal boxes
-2 Split system heat pumps
-3 Forced air furnaces
-Emergency generator
-Full DDC Building Automation System

OWNER: ASHLAND SCHOOL DISTRICT
201 S. Mountain Ave. Ashland, OR 97520

Owner: Gary Sisk, Maintenance Foreman
Owner's Rep: Gary DeCock, Project Manager
P: 541.482.1626

Eugene State Office Building

Renovation: Plumbing design and HVAC load calculations for construction of 12,400 square foot exercise facility.

-2 New central condensing boilers and tie in with existing primary/secondary hydronics
-2 Roof mounted chillers and tie in with existing hydronics
-Condensing hot water heater w/ domestic hot water circulation system
-Multiple exhaust fans, pumps, and convectors

-Central Variable speed Air Handlers with dehumidification
-Multiple VAV air handling boxes  
-Multiple fan powered boxes
-Office wide chilled beams
-Split system heat pump
-Emergency generator
-Full DDC Building Automation System

OWNER: OREGON DEPARTMENT OF ADMINISTRATIVE SERVICES
1225 SE Ferry St. SE U100 Salem, OR 97301

Owner's Rep: Steve Ponce, Project Manager
P: 503.373.7167

Oregon State Police Crime Laboratory

-Gas fired heat reccovery ventilator
-Roof mounted variable speed air VAV handler
-Multiple exhaust fans
-Multiple VAV terminal boxes and Return terminal boxes
-Full DDC Building Automation System

OWNER: OREGON DEPARTMENT OF ADMINISTRATIVE SERVICES
1225 SE Ferry St. SE U100 Salem, OR 97301

Owner's Rep: Larry Befus, Project Manager
P: 503.373.7110

North Medford High School

Renovation and New Construction: Commissioning services for 250,000 square foot high school mechanical upgrades.  Medford, Oregon

-8 Gas fired condensing boilers

-1 Oil fired boiler

-2 Variable speed chillers with cooling tower

-35 Variable speed multizone air handlers

-Multiple hydronic pumps

-Multiple cabinet unit heaters and convectors
-Dust collector

-Gas fired radiant heating
-Multiple exhaust fans
-3 Rooftop gas pack/Dx units
-Full DDC Building Automation System

OWNER: MEDFORD SCHOOL DISTRICT
2801 Merriman Road Medford, OR 97501

Owner's Rep: Mark Button, Project Manager

Todd Liles, Project Manager

Rick Rose, Facilities Manager
P: 503.373.7110

South Medford High School

New Construction: Commissioning services for 253,000 square foot high school.  Medford, Oregon

-3 Gas fired condensing boilers

-2 Air Cooled variable speed chiller

-18 Packaged rooftop units

-28 four pipe heat recovery ventilators

-19 Split air conditioning systems

-68 VAV terminal units

-5 radiant floor systems

-Multiple hydronic pumps

-Multiple cabinet unit heaters and convectors
-Multiple exhaust fans

-Emergency Generator
-Full DDC Building Automation System

OWNER: MEDFORD SCHOOL DISTRICT
2801 Merriman Road Medford, OR 97501

Owner's Rep: Mark Button, Project Manager

Rick Rose, Facilities Manager
P: 503.373.7110

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM

Retrofit: Commissioning services for the replacement of central chillers.

-Two VSD hydronic chillers, 360 tons total capacity

-Variable Flow pumps and system valves

-Closed VSD Cooling Tower
-Code compliance updates

-Additional safety controls and interlocks with existing equipment

OWNER: CITY OF SALEM (OREGON)

1580 20th Street SE, Bldg. #24 Salem, OR 97302-1254

Bob Miller, Project Manager

Luke Bergerson, Operations Supervisor

P: 503.584.4601

Grande Ronde Hospital USP-797 Pharmacy Update

Retrofit: Commissioning services for USP-797 remodel to pharmacy and drug compounding areas.

-Anti-Room, compounding, and storage ventilation/filtration/conditioning and pass-throughs

-Pharmacy wide remodel with new HVAC

-Miscellaneous office spaces

OWNER: GRANDE RONDE HOSPITAL, INC.

900 Sunset Drive, La Grande OR, 97850

Elaine La Rochelle, Director of Facilities

Joel Donivan, Project Manager

P: 541.963.1535

Da Vinci Middle School

Mechanical Controls Upgrades: Commissioning services for 84,000 square foot middle school.  Portland, Oregon

-Pneumatic to Electric controls conversion

-Steam Boiler controls

-Domestic Hot Water controls

-BAS monitoring for Natural Gas, Electric, and Domestic Water meters

-Ventilation controls

-Fan VFDs for two central air handlers
-Full DDC Building Automation System

OWNER: PORTLAND PUBLIC SCHOOLS
501 N. Dixon Portland, OR 97227

Owner's Rep: Steve Effros, Project Manager

Lyndon Dyer, Facilities Controls Manager
P: 503.916.3279

Russell Academy

Renovation: Commissioning services for 32,500 square foot elementary school.  Portland, Oregon

-Full DDC Building Automation System

-29 Unit Ventilators

-3 Fan Coil air handlers (2-Pipe)

-8 Unit Heaters

-2 Split system AC units

-Hot water boiler

-Multiple Pumps and Exhaust Fans

-Kiln

-Convectors

-Domestic Hot Water controls

OWNER: PARKROSE SCHOOL DISTRICT
10636 NE Prescott Street Portland, OR 97220

Owner's Rep: HEERY International, Gordon Odette

Mary Larson
P: 503.408.2100

Oak Grove Elementary

New Construction & Renovation: Commissioning services for 22,700 square foot elementary school.  Medford, Oregon

-Full DDC Building Automation System

-VAV air handler with terminal unit reheat

-VRF system with 20 fan coil zones

-2 Condensing boilers

-Air cooled chiller

-Multiple pumps and exhaust fans

-Kiln

-Split system AC for electrical and IDF room (Intermediate Distribution Frame)

OWNER: MEDFORD SCHOOL DISTRICT
2801 Merriman Road Medford, OR 97501

Owner's Rep: Mark Button, Project Manager

Rick Rose, Facilities Manager
P: 503.373.7110

Lone Pine Elementary

New Construction & Renovation: Commissioning services for 51,900 square foot elementary school.  Medford, Oregon

-Full DDC Building Automation System

-Packaged Gas/Dx VAV air handler with terminal unit reheat

-16 Packaged rooft top units

-1 Condensing boiler for reheat and convectors

-Multiple pumps and exhaust fans

-Split system AC for electrical and IDF room (Intermediate Distribution Frame)

OWNER: MEDFORD SCHOOL DISTRICT
2801 Merriman Road Medford, OR 97501

Owner's Rep: Mark Button, Project Manager

Rick Rose, Facilities Manager
P: 503.373.7110

Jackson Elementary

New Construction & Renovation: Commissioning services for 51,900 square foot elementary school.  Medford, Oregon

-Full DDC Building Automation System

-3 Packaged Gas/Dx VAV air handlers with terminal unit reheat + Energy Recovery

-2 Condensing boilers for reheat and convectors

-Multiple pumps and exhaust fans

-4 Split system AC units

-Unit heater (freeze protection)

-Emergency Generator

OWNER: MEDFORD SCHOOL DISTRICT
2801 Merriman Road Medford, OR 97501

Owner's Rep: Mark Button, Project Manager

Rick Rose, Facilities Manager

Jim McNamara, Project Manager
P: 503.373.7110

Roosevelt Elementary

New Construction & Renovation: Commissioning services for 51,000 square foot elementary school.  Medford, Oregon

-Full DDC Building Automation System

-5 Packaged Gas/Dx VAV air handlers with terminal unit reheat + Energy Recovery

-1 Packaged rooft top units

-2 Condensing boilers for reheat and convectors

-Multiple pumps and exhaust fans

-4 Split system AC units

-Unit heater (freeze protection)

-Emergency Generator

OWNER: MEDFORD SCHOOL DISTRICT
2801 Merriman Road Medford, OR 97501

Owner's Rep: Mark Button, Project Manager

Rick Rose, Facilities Manager

Jim McNamara, Project Manager
P: 503.373.7110

North Medford H.S. Media Center

New Construction: Commissioning services for 20,000 square foot media center.  Medford, Oregon

-Full DDC controls

-1 Multizone VAV 4-pipe air handler

-1 VAV 4-pipe air handler with terminal reheat units

-1 Constant volume 4-pipe air handler

-Convectors

OWNER: MEDFORD SCHOOL DISTRICT
2801 Merriman Road Medford, OR 97501

Owner's Rep: Mark Button, Project Manager

Rick Rose, Facilities Manager

Nick Bush, Project Manager
P: 503.373.7110